On 28 June 2025, the 100.1% LIVE festival marked the 30th anniversary of Silver Rain radio at the Ostankino TV Tower venue in Moscow. The real project used 1,000 m² of rented temporary structures, while the organizer reported an attendance of more than 12,000 visitors.
Arch tents and wooden pavilions
The verified configuration included ARCH TENT SQUARE 400/10 structures measuring 20×20 m and 400 m², together with wooden pavilions. The structures formed part of a single open-air festival layout.
Flooring, furniture, branding and lighting
The scope included a timber-and-plywood floor, furniture, event branding and lighting. This provided the venue with a coordinated temporary infrastructure package rather than separate empty structures.
Installation schedule
Installation was completed in 3 days. After the festival, dismantling took 1 day.
Application for UAE events
This portfolio reference illustrates a scalable approach to festival infrastructure, brand activations and large open-air public events. TentProject can configure a comparable solution for UAE venues based on the site, event format and required supporting services.
Visualisation note: This page is based on a real completed project. For presentation to the UAE market, gallery images may be visually adapted to illustrate how a similar configuration could look in a local environment. These visuals are illustrative and are not documentary photographs of a completed UAE installation.