Logistics

TentProject provides comprehensive logistics solutions for tent structures and metal constructions across the UAE.


Delivery Services

TentProject provides delivery of tents and metal structures across the UAE using its own fleet.

Delivery Timelines

  • In-stock items: Shipping completed within 1–2 business days after order confirmation
  • Custom-made structures: 3–5 business days for production before dispatch
  • Delivery timelines: Agreed upon individually based on project requirements

Shipping Conditions

  • All items are securely packed and stabilized for transit
  • Liability for shipments transfers to the buyer only upon handover to third-party carriers
  • We recommend inspecting the goods upon receipt

Special Delivery Arrangements

For remote locations or special venues (e.g., festivals, events), delivery terms and logistics are tailored case-by-case.

Costs vary based on order size and destination — contact TentProject managers for precise quotes.


Self-Pickup Services

We provide the service of self-pickup for tent structures and canopies from our production facility.

The cargo vehicles used must meet a number of requirements for loading operations:

  1. The packaged structure is loaded into the vehicle using a forklift, and a pallet with the tent fabric is placed on top.
  2. Packaged boards are loaded manually into the same vehicle, as they may break if handled with a forklift.
  3. Aluminum beams are also loaded using a forklift.
  4. Clamps, screws, and supports are placed in boxes on the beams and secured together with strapping tape.

Vehicle Requirements by Size

  • Small tent structures (up to 3 cubic meters and weighing no more than 2.5 tons): Delivery carried out using our own fleet of vehicles
  • Larger tents: Delivery performed by partner transport and logistics companies
LogisticsLogistics